Back To ServicesProject Dossier · PRJ-001
CompletedTextileDhaka
Rooftop Textile Cluster Solar
A high-load textile rooftop deployment engineered for stable daytime self-consumption and reduced grid draw.
Project Identity
Verified delivery metadata
Client
Apex Knitwear Group
Location
Gazipur, Dhaka
Installed Capacity
1,820 kW
Commissioned
2025
Industrial Readiness
Safety and QA audit completed
Performance baseline archived
O&M handover pack delivered
Capacity
1,820 kW
Estimated Yield
2,639,000 kWh/yr
Delivery Timeline
6 months
Availability Target
99.5%
Technical Evidence
Verifiable completion and operational proof points
- Grid energy reduced by 31%
- Commissioning QA passed in 14 days
- Remote monitoring active
Execution Notes
Delivery controls used on this project
Site survey and load baseline validated
Engineering drawing package approved
Commissioning and acceptance tests passed
Monitoring and alerts configured
Client operation training completed