Cinematic Ecological Industrialism · v1.0.0

Empowering the Industrial Revolution

A cinematic operating system for clean energy — from the rooftop to the substation.

Grid demand · 24h
Tongi industrial corridor
000408121620
Peak
98 MW
14:00
Solar supply vs Grid · today
ElectroWatt fleet, real-time
000408121620
Solar contribution
46.2%
+3.1% vs yday
Carbon offset, network-wide
18,342.7tCO₂
Plants online
1,284
MWh today
42,917
Households powered
318k

The full clean-energy stack

Four surfaces. One cinematic operating system.

Company Snapshot Bangladesh Focus

We build industrial decarbonization infrastructure, not just solar sites.

ElectroWatt combines engineering, procurement, operations, digital monitoring, and finance-aware design into one delivery workflow. We support manufacturers, agro-processors, logistics parks, and rural irrigation programs with measurable energy and cost outcomes.

Established
2018
Team
160+
Active Plants
148
Installed
8.36 MW

Milestones

How the company matured into a full-stack energy platform.

2018
ElectroWatt founded

Started as a specialist team for industrial rooftop feasibility and EPC advisory.

2021
AI-aided audit introduced

Integrated simulation-driven design for higher-confidence payback and yield models.

2024
Nationwide expansion

Scaled delivery and O&M coverage across multiple divisions in Bangladesh.

2026
Cinematic operations surface

Unified marketplace, audit, and operations under one visual command interface.

Service capability summary

Key delivery lines and response commitments.

View all service specifications
EPC-01
On-site
Industrial Solar EPC
48h feasibility kickoff
Yield guarantee up to 99.2% PR
Safety target: zero LTI
OM-03
Hybrid
Operations and Maintenance
24/7 remote diagnostics
Plant availability >= 99.5%
Fault response under 90 minutes
AI-07
Remote
AI Audit and SEMS Simulation
Same-day simulation report
Scenario confidence index >= 94%
Bankable report in 12h
PAYG-11
Hybrid
Rural Irrigation PAYG
72h village deployment planning
Pump uptime >= 97%
Cost reduction up to 40%
GRID-05
Remote
Grid and Net-Meter Advisory
3-day compliance readiness
Interconnection approval acceleration
Curtailment risk mapping

Nationwide project highlights

A quick snapshot from our completed portfolio across the country.

Open Full Project List