Back To ServicesProject Dossier · PRJ-003
CompletedAgro ProcessingRajshahi
Dairy Process Plant Hybrid
Hybrid solar design for dairy processing with optimized storage dispatch for refrigeration and packaging lines.
Project Identity
Verified delivery metadata
Client
North Fresh Dairy
Location
Bogura, Rajshahi
Installed Capacity
610 kW
Commissioned
2023
Industrial Readiness
Safety and QA audit completed
Performance baseline archived
O&M handover pack delivered
Capacity
610 kW
Estimated Yield
884,500 kWh/yr
Delivery Timeline
3 months
Availability Target
99.2%
Technical Evidence
Verifiable completion and operational proof points
- Hybrid dispatch profile validated
- Fuel displacement tracked monthly
- Load-priority matrix deployed
Execution Notes
Delivery controls used on this project
Site survey and load baseline validated
Engineering drawing package approved
Commissioning and acceptance tests passed
Monitoring and alerts configured
Client operation training completed